Signal Ledger valuation · OKLO

Oklo Inc.

What the shares are worth today on our research (cited consensus, company plans and peers, since management sets no usable targets): every line valued at the end of FY2030, net debt rolled forward, then discounted back to Jun 30, 2026.

Signal Ledger valuation$12.51−54% vs $27.01
Business value at FY2030
$2.3B
FY2030 revenue
$0.1B
FY2030 EPS · P/E
−$0.45 · —
Discount rate (WACC · equity)
9.51% · 9.51%

How this is built. Oklo has no revenue yet and gives no plant costs or long-range targets. This estimate values the Idaho plant and the 1.2 GW Meta campus on their stated schedules at DOE cost estimates and ~$110/MWh, plus about a fifth of the non-binding pipeline (3 GW) as the expected further build. Each input below shows its basis: consensus, company plan, peer or rule.

Researched Oct 23, 2026 from SEC filing 0001628280-26-054571 · price $27.01 at research time · Valuation methodology

What each business is worth

BusinessModelFY2030 revenueValue todayPer share2030 multipleValue from beyond FY2030
Aurora powerhousesPowerhousesPlants (project NPV)$0.1B−$0.1B−$0.74—-7131%
All businesses$0.1B−$0.1B−$0.74

From 2030 back to today

  1. Enterprise value at end of FY2030$2.3B
  2. Plus net cash at FY2030$0.9B
  3. Equity value at FY2030$3.2B
  4. ÷ (1 + 9.51%)^4.5 years at the cost of equity$2.1B
  5. + dividends paid on the way, discounted$0B

This reconciliation checks the published Signal Ledger valuation against the net-debt path. The difference is 8.6% — more than our 5% tolerance. Usually the net debt path borrows at a much lower rate than the discount rate assumes; treat the value as less certain.

From businesses to one share

  1. All businesses, valued today−$0.1B
  2. − borrowings$0B
  3. − finance leases$0B
  4. + cash and short-term investments$2.5B
  5. ÷ diluted shares0.186B
  6. Signal Ledger valuation$12.51

Year by year to FY2030

Fiscal yearRevenueEBITDACapexFree cash flowNet debt at year end
FY2026$0B−$0.2B$0.2B−$0.4B$2.3B cash
FY2027$0B−$0.2B$0.2B−$0.4B$2.1B cash
FY2028$0B−$0.2B$0.5B−$0.7B$1.5B cash
FY2029$0.1B−$0.2B$0.3B−$0.2B$1.3B cash
FY2030$0.1B−$0.2B$0.3B−$0.4B$0.9B cash

What must be true

  • The company spends $1.6B of capital expenditure through FY2030.
  • The company stays net cash throughout (lowest point $0.9B of net cash in FY2030).
  • Aurora-INL (Idaho National Laboratory) (75 MW) runs from FY2029 for $0.7B of build cost, worth $1.968M today.
  • Ohio campus phase 1 (Pike County, for Meta) (150 MW) runs from FY2031 for $0.9B of build cost, worth $58.039M today.
  • Ohio campus build-out to 1.2 GW (1,050 MW) runs from FY2035 for $5.3B of build cost, worth $0.8B today.
  • Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline) (3,000 MW) runs from FY2036 for $13.5B of build cost, worth $1.3B today.

What the price implies

Joint sales and margin requirements do not apply to this project NPV model.

At the research price of $27.01 (2026-10-23), the price asks more than our assumptions overall. These are operating requirements at that price, not additional valuations or forecasts.

Implied discount rate
7.9%

The WACC that makes model value equal the price, shifting WACC and cost of equity by the same amount. Model: 9.5% WACC · 9.5% cost of equity.

All-business FY2030 sales factor
—

This model has no margin or capacity revenue paths to scale. FY1 stays fixed; the sales change ramps to FY2030 and stays at that factor thereafter.

Single-business sales and margin comparisons do not apply to asset, financial, project or REIT valuation lines.

Mechanical requirements, not forecasts. The separate sales-only and single-business factors are searched from 0.1× to 6×; an unsolved comparison means this business alone cannot get there within those bounds. Single-business revenue changes apply from FY2 onward; margin changes scale the full EBIT or EBITDA margin path. Mixed groups show revenue-weighted EBIT and EBITDA margins separately. Requirements above 100% are not feasible margins. Joint rows instead search non-negative uniform margin factors only up to the EBIT/EBITDA guardrails; the entire margin path scales, including post-FY2030 convergence. Sales and margins change together only in that table. The rate search runs from the largest terminal growth rate plus 0.5 percentage points to 30% WACC.

The discount rate

Cost of equity
9.51%

r_f 3.87% (5-year average 10-year Treasury yield 3.87% (spot 5.13% on 2026-10-21)) + β 1.13 after Blume adjustment × 5%, rounded to 0.01% (1bp)

WACC
9.51%

methodology §4.5: market-weighted WACC, not rounded

10-year Treasury · model / spot
3.87% · 5.13%

The model uses the recorded 5-year average Treasury yield. The spot yield is shown for context.

Every input, with its source

Show 42 inputs · reported, guidance and rule-based
InputValueBasisWhy
CapacityAurora powerhouses · Aurora-INL (Idaho National Laboratory)75 MWGuidancethe first Aurora powerhouse, at the line's 75 MWe rating 10-Q Q2 2026 (0001628280-26-054571) Note 1: Aurora product line 15–75 MWe; Q2 2026 earnings call 2026-08-07 (75 MW full-power operation)
First full year of operationAurora powerhouses · Aurora-INL (Idaho National Laboratory)FY2029Guidancego-live in 2028, so FY2029 is the first full year of operation Q2 2026 earnings call 2026-08-07: "2028 is still the targeted go-live" (CFO)
Build costAurora powerhouses · Aurora-INL (Idaho National Laboratory)$9,000/kWPeerOklo has not disclosed a cost for Aurora-INL ("not yet providing full guidance", Q2 2026 call); first-of-a-kind advanced reactor estimate liftoff.energy.gov ↗
Power priceAurora powerhouses · Aurora-INL (Idaho National Laboratory)$110/MWhPeerhyperscalers pay ~$110/MWh for firm nuclear power from a restarted plant; a new plant needs at least that, and the CEO's ~$100 dates from 2024 Jefferies estimate of the Microsoft–Constellation Crane (TMI-1) 20-year PPA, ~$110–115/MWh (Sept 2024); CEO Jacob DeWitte, Bloomberg 2024-12-18: about $100/MWh
Capacity factorAurora powerhouses · Aurora-INL (Idaho National Laboratory)92.0%PeerU.S. nuclear fleet average EIA Electric Power Monthly Table 6.07.B, U.S. nuclear capacity factor ~92% (2023–2025)
EBITDA marginAurora powerhouses · Aurora-INL (Idaho National Laboratory)55.0%Rulea 75 MWe fast reactor on HALEU fuel is assumed to cost more to fuel and run, about $45/MWh, leaving 55% of a $100/MWh price NEI 'Nuclear Costs in Context' (2024): average generating cost $31.76/MWh for the large-reactor fleet
LifeAurora powerhouses · Aurora-INL (Idaho National Laboratory)40 yearsPeerstandard initial licence term 10 CFR 50.51: initial operating licence term of 40 years
Investment tax creditAurora powerhouses · Aurora-INL (Idaho National Laboratory)30.0%Reportedzero-emission plant placed in service before the credit phases down 26 U.S.C. §48E (clean electricity investment credit), 30% with prevailing-wage and apprenticeship requirements; nuclear kept by Public Law 119-21
CapacityAurora powerhouses · Ohio campus phase 1 (Pike County, for Meta)150 MWRulephase 1 size is not stated; assumed two 75 MWe powerhouses businesswire.com ↗
First full year of operationAurora powerhouses · Ohio campus phase 1 (Pike County, for Meta)FY2031Guidanceonline in 2030, first full year FY2031 Oklo–Meta release 2026-01-09: first phase could come online as early as 2030
Build costAurora powerhouses · Ohio campus phase 1 (Pike County, for Meta)$6,200/kWPeerunits after the first plant; Oklo gives no cost; Kiewit MOU covers EPC planning liftoff.energy.gov ↗
Power priceAurora powerhouses · Ohio campus phase 1 (Pike County, for Meta)$110/MWhPeerhyperscalers pay ~$110/MWh for firm nuclear power from a restarted plant; a new plant needs at least that, and the CEO's ~$100 dates from 2024 Jefferies estimate of the Microsoft–Constellation Crane (TMI-1) 20-year PPA, ~$110–115/MWh (Sept 2024); CEO Jacob DeWitte, Bloomberg 2024-12-18: about $100/MWh
Capacity factorAurora powerhouses · Ohio campus phase 1 (Pike County, for Meta)92.0%PeerU.S. nuclear fleet average EIA Electric Power Monthly Table 6.07.B
EBITDA marginAurora powerhouses · Ohio campus phase 1 (Pike County, for Meta)55.0%Rulesame operating cost assumption as Aurora-INL, ~$45/MWh NEI 'Nuclear Costs in Context' (2024)
LifeAurora powerhouses · Ohio campus phase 1 (Pike County, for Meta)40 yearsPeerstandard initial licence term 10 CFR 50.51
Investment tax creditAurora powerhouses · Ohio campus phase 1 (Pike County, for Meta)30.0%Reportedzero-emission plant; credit available for construction beginning before 2034 26 U.S.C. §48E
CapacityAurora powerhouses · Ohio campus build-out to 1.2 GW1,050 MWGuidancethe rest of the 1.2 GW campus after phase 1 Oklo–Meta release 2026-01-09: campus scales to 1.2 GW by 2034
First full year of operationAurora powerhouses · Ohio campus build-out to 1.2 GWFY2035Guidancefull capacity in 2034, first full year FY2035 Oklo–Meta release 2026-01-09: 1.2 GW by 2034
Build costAurora powerhouses · Ohio campus build-out to 1.2 GW$5,000/kWPeerunits 4–17 of the same 75 MWe design on one site: about a third of the way down DOE's learning curve liftoff.energy.gov ↗
Power priceAurora powerhouses · Ohio campus build-out to 1.2 GW$110/MWhPeerhyperscalers pay ~$110/MWh for firm nuclear power from a restarted plant; a new plant needs at least that, and the CEO's ~$100 dates from 2024 Jefferies estimate of the Microsoft–Constellation Crane (TMI-1) 20-year PPA, ~$110–115/MWh (Sept 2024); CEO Jacob DeWitte, Bloomberg 2024-12-18: about $100/MWh
Capacity factorAurora powerhouses · Ohio campus build-out to 1.2 GW92.0%PeerU.S. nuclear fleet average EIA Electric Power Monthly Table 6.07.B
EBITDA marginAurora powerhouses · Ohio campus build-out to 1.2 GW55.0%Rule~$45/MWh operating cost NEI 'Nuclear Costs in Context' (2024)
LifeAurora powerhouses · Ohio campus build-out to 1.2 GW40 yearsPeerstandard initial licence term 10 CFR 50.51
Investment tax creditAurora powerhouses · Ohio campus build-out to 1.2 GW30.0%Reportedconstruction beginning before 2034 26 U.S.C. §48E
CapacityAurora powerhouses · Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline)3,000 MWRulethe agreements are non-binding: about a fifth of the ~14 GW pipeline outside Ohio is counted as the expected build. The platform cost runs forever, so the fleet it develops must keep growing after Ohio businesswire.com ↗
First full year of operationAurora powerhouses · Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline)FY2036Ruleafter the Ohio campus is complete (2034), first full year FY2036 Oklo–Switch release: deployments through 2044
Build costAurora powerhouses · Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline)$4,500/kWPeerbuilt after ~20 units, close to DOE's NOAK cost DOE Pathways to Commercial Liftoff: Advanced Nuclear (2023): ~$3,600/kW NOAK after 10–20 units
Power priceAurora powerhouses · Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline)$110/MWhPeerhyperscalers pay ~$110/MWh for firm nuclear power from a restarted plant; a new plant needs at least that, and the CEO's ~$100 dates from 2024 Jefferies estimate of the Microsoft–Constellation Crane (TMI-1) 20-year PPA, ~$110–115/MWh (Sept 2024); CEO Jacob DeWitte, Bloomberg 2024-12-18: about $100/MWh
Capacity factorAurora powerhouses · Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline)92.0%PeerU.S. nuclear fleet average EIA Electric Power Monthly Table 6.07.B
EBITDA marginAurora powerhouses · Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline)55.0%Rule~$45/MWh operating cost NEI 'Nuclear Costs in Context' (2024)
LifeAurora powerhouses · Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline)40 yearsPeerstandard initial licence term 10 CFR 50.51
Investment tax creditAurora powerhouses · Further data-center plants (risk-weighted 3 GW of the ~14 GW pipeline)0.0%Reportedconstruction starts after the credit phases down: none assumed 26 U.S.C. §48E as amended by Public Law 119-21: phase-down for construction beginning after 2033
Price escalationAurora powerhouses2.0%Ruletypical long-term PPA escalator no escalator disclosed
Platform cost a yearAurora powerhouses$0.2BReportedlast four quarters of R&D and G&A not capitalised into plants 10-Q Q2 2026 and 10-K FY2025: operating expenses FY2025 $139.3M − H1 2025 $45.9M + H1 2026 $125.4M
WACCDiscount rates9.51%Rulemethodology §4.5: market-weighted WACC, not rounded FRED DGS10 2021-10-20..2026-10-21
Cost of equityDiscount rates9.51%Ruler_f 3.87% (5-year average 10-year Treasury yield 3.87% (spot 5.13% on 2026-10-21)) + β 1.13 after Blume adjustment × 5%, rounded to 0.01% (1bp) 60 monthly returns vs SPY, 2021-09..2026-09 (adjusted closes)
Tax rateDiscount rates21.0%RuleU.S. federal statutory rate; Oklo has no taxable income yet 26 U.S.C. §11(b)
Cash and short-term investmentsBalance sheet$2.5BReportedcash, cash equivalents and short-term investments us-gaap:CashAndCashEquivalentsAtCarryingValue + us-gaap:DebtSecuritiesAvailableForSaleExcludingAccruedInterestCurrent · 0001628280-26-054571 (filed 2026-08-07)
BorrowingsBalance sheet$0.7MReportedborrowings due within a year plus long-term borrowings; current liabilities fully tagged and reconciled; no current borrowing line; sec.gov ↗
Finance leasesBalance sheet$0.187MReportedfinance lease liabilities (capex-like; deducted once) us-gaap:FinanceLeaseLiability · 0001628280-26-054571 (filed 2026-08-07)
SharesBalance sheet0.186BReportedshares outstanding as of 2026-08-04 cover page of 10-Q 0001628280-26-054571
Dividends per yearShareholders$0.0BReportedOklo pays no dividend × 0.186B shares no dividends declared

Research notes

  • share-count comparison: 0.176224404B quarter 2026-04-01..2026-06-30 · 0001628280-26-054571; point-in-time denominator retained
  • cost of equity 9.51% (β 1.13 after Blume adjustment), WACC 9.5%
  • Aurora powerhouses: 4 announced project(s), 4,275 MW owned share (methodology §3.6)
  • Powerhouses: development platform costs exceed the NPV of the plants valued (−$0.74/share)
  • enterprise and equity-chain values differ by 8.6% (limit 5%)

Signal Ledger research built from cited consensus, company plans and peer economics because management sets no usable targets — not a forecast and not investment advice. The research desk (Claude Opus 5.5) gathers filings, guidance and targets; deterministic code applies the samepublished rules to every company and checks the result. Inputs may contain errors; follow the source links before relying on them. Read our valuation methodology →